SPECIFICATION: Maintenance/
repairs to Air conditioning units for a period of 12 months on As and When
required basis
Contents
1. Scope Of Work
2. Definitions
3. Maintenance References and
Compliance
4. Maintenance Units Identity
5. Preventative Maintenance
6. Contract Performance
7. Terms Of Payment
8. Pricing
9. Bill Of Quantities
Appendix 1:
Maintenance Schedules Tasks Description
1. Scope Of Work
1.1. The scope of the work / services to be provided by the contractor is as follows:
§ Carry out preventative maintenance and
corrective maintenance or repairs to Air-conditioning Units, Electrical and
Cooling Towers on as and When required basis.
§ The scope also includes a 24hr, Monday to Friday
emergency service as and when required by WATERBERG TVET COLLEGE
§ The contractor will ensure that Air-conditioning
units works effectively and will point out all major faults to WATERBERG TVET
COLLEGE
2. Definitions
2.1Project Manager Infrastructure: A manager of WATERBERG TVET COLLEGE responsible of building and infrastructure portfolio or any person lawfully acting in that capacity.
2.2Maintenance Unit: Air-conditioning Units.
2.3Normal Working Hours: Hours of work as determined by a wage regulating measure or statutory enactment for any trade or activity, during which the basic minimum rate of pay is applicable and excludes all time for which a higher rate of pay is obligatory. Where no wage regulating measure is in force, the hours will be 07h00 to 17h00 Mondays to Fridays excluding a daily meal break.
2.4Contractor: Successful tender who is appointed by
WATERBERG TVET COLLEGE and will be responsible to carry out the works as per
this specification.
3. Maintenance References and Compliance
3.1. All electrical and air-conditioning work will be in accordance with the following publications
§ SABS 0142, SABS 1152 and SABS 0147 Code Of
Practices
§ E7/1 or E7/2, E4E specifications
§ OHS Act 85 of 1993 as amended and
§ Other applicable Municipal By-Laws and
Regulations
§ Contractor
must submit a Category B certificate for an employee who has been trained as a
gas practitioner.
§ Contractor must submit at least three CVs for qualified (Trade Tested) technicians and attached all certificates for trade test. Two of these technicians must be trade tested Air con technicians and one must be trade tested electrician.
4. Maintenance Units Identity
The contractor must
familiarize himself with units installed on campuses. This can be arranged with
Project Manager Infrastructure. Rates quoted must be inclusive of any ac unit
that will be attended
5. Preventative Maintenance
5.1. All planned work will be carried out during normal working hours at the cost tendered for in the Bill Of Quantities. Visits to the premises will be as scheduled for the contractor to carry work on the maintenance units as per this specification. The Air-handling units room will have a site log book which is to be properly completed by the Contractor on every visit and the reason for the visit recorded.
5.2. Planned work referred to herein will include
§ Monthly service as and when requested by Project Manager Infrastructure on maintenance units and cleaning of the cooling tower (where applicable);
See
Appendix 1 for the minimum tasks to be performed for each maintenance schedule.
5.3. The Contractor shall produce and issue to WATERBERG TVET COLLEGE a written report of any testing, inspection, examination, investigation and/or assessment undertaken and execution of any repairs by the Contractor. Reports will highlight
§ the type of work or service done
§ problems experienced
§ results of inspection
§ faults found and their priority thereof
Quotations for any corrective work required shall be submitted to WATERBERG TVET COLLEGE and on the approval of such quotations the Contractor will correct or repair accordingly.
5.4. WATERBERG TVET COLLEGE reserves the right to
conduct an independent safety and quality audit to be carried out on the
maintenance performance of the units. The contractor shall provide his own
quality controls to ensure compliance with the specifications, units
maintenance manuals, any changes to legislation or regulations applicable to
the maintenance units and possible modernisation products to upgrade or to
improve the reliability and performance of the units will be brought to
WATERBERG TVET COLLEGE for consideration.
6. Contract Performance
6.1. The contractor will sign a service level agreement with the WATERBERG TVET COLLEGE.
§ the number of breakdowns for specific period
§ the turn around time to attend to emergency
callouts
§ planned vs. actual progress
§ submission of reports, invoices and other
administration duties
§ payment of invoices
7. Terms Of Payment
7.1. The terms of payment will be monthly and upon receiving the invoice, WATERBERG TVET COLLEGE shall pay the Contractor within 30 days. This is subject to the invoicing being both correct and free from anomalies.
7.2. All pricing information shall be exclusive of VAT.
7.3. Invoices shall show the period, the lump sum for the maintenance work and the breakdown of all work for which the payment is being claimed for. All non-maintenance invoices shall be presented on a per maintenance unit basis and a fully itemized list of the work being charged for will be incorporated into the invoice. A photocopy of the worksheet which shall indicate entry and exit times from site which shall be signed by the WATERBERG TVET COLLEGE representative shall be attached to the invoice and any invoices submitted without this attachment and fully completed to the satisfaction of the WATERBERG TVET COLLEGE will be rejected.
7.4. Additional works shall be separately invoiced and these shall be submitted monthly. Where such works are covered by the Schedules of Rates the schedules shall be strictly adhered to in preparing the invoice. Works authorized by WATERBERG TVET COLLEGE representative which falls outside the scope of the contract and the Bill Of Quantities shall be invoiced separately and fully detailed with the works involved and cross referenced to the issued order number. WATERBERG TVET COLLEGE reserves the right to request the invoice for the material or spare parts purchased by the Contractor on the works done.
7.5. If invoices are presented which do not fully comply with the format as detailed, they will be rejected. All invoices shall portray the identity number of the maintenance unit involved and site location and VAT as a sum of money shall be included within the total monies being claimed. A schedule of accumulative costs shall be submitted each month showing the expenditure to date of non-contract repair works and misuse / vandalism as two separate totals. WATERBERG TVET COLLEGE will accept no liability and/or responsibility for the late payment of the invoices which have been incorrectly addressed by the Contractor.
7.6. No payment shall be made by WATERBERG TVET COLLEGE for any unauthorized
service performed by the Contractor.
8. Pricing
8.1. From the compulsory site briefing, the Contractor shall familiarized himself with the present conditions of the maintenance units and submit prices accordingly; additional changes to the maintenance contract will not be accepted.
8.2. The Contractor shall include for all costs associated with the works for his use to include plant, tools, test equipment, chemicals, sundry materials; temporary lighting, small plant and tools; temporary plant and equipment to maintain operations in breakdowns; off-loading, hoisting and handling of all materials and plant; access to the works, administration and security; transport for staff; protecting the Works; safety, health and welfare of people; removing rubbish, protective casings and coverings away from the site and cleaning the works on completion; temporary screens, hoardings, guard rails, landing barriers, scaffolding and similar items; control of noise, pollution and all other statutory obligations; all necessary attendances in connection with examination and/or tests in compliance with OHS Act Regulations and all necessary management and supervision of the Works.
8.3.
There will be and agreed
annual percentage escalation on this maintenance contract on items listed on
the Schedule of Prices.
Maintenance Unit |
Maintenance Schedule |
Tasks Description |
1. Air-Handling Units and Packaged Units |
Monthly |
§ Run and visually inspect all equipment covered § Check and clean filters § Check condition of finned surface of cooling
coil for physical damage and comb as required § Check effectiveness of canvas collars on fan § Check and adjust drive belt tension of supply
air fan § Check condition and report on supply air fan
belt § Check for abnormalities on fan motor § Check condition and clean supply air fan
impeller § Check supply air fan motor holding down bolts § Check supply air fan securing bolts § Check supply air fan bearings § Check for abnormal noises and vibration of
supply air fan § Check security on shaft of supply air fan an
motor pulleys § Check and clean condenser drain pans and drain
pipes § Run unit with covers off and check for undue
vibration on fan motor § Check and report on unit access cover panel
catches § Make sure that all covers, panels, doors and
closing screws are replaced after each service § Check operation of 3 way control valves. § Remove all air flow obstructions from coils
and fins § Inspect fan operation (observe the different
stages of cooling are operational as applicable) § Check belt ware and tension § Check bearings and bearing lubricant § Check for pipe connection leaks § Inspect for Leaks § Record operating temperatures, pressure and
amperages § Clean the machine § Clean the machine Plant Room § Check for correct operations of Condenser
Pumps § Check for undue noise or excessive vibration
of Condenser Pumps § Pressure clean finned cooling and heating
coils with approved chemical agent § Remove all corrosion treat with a suitable
corrosion inhibitor and repaint. § Report condition of filters § Pressure clean finned coils with approved
chemical agent § Inspect Motor Mounts. § Determine level of condenser tube fouling and
mechanically brush-clean tubes if required. § Clean external surfaces and restore damaged
paint work. § Run and visually inspect all equipment covered § Record operating temperatures, pressure and
amperages § Check refrigerant charge § Check for refrigerant leaks § Clean the machine § Clean the machine Plant Room § Report any deficiencies |
2. Cooling Towers |
Monthly |
§ Remove inspection panels and inspect unit
thoroughly internally and externally § Clean thoroughly all strainers, spray nozzles,
sump and air screen panels § High pressure clean eliminators § Clean float valve assembly and check for
proper operation § Operate all hand valves and inspect for
correct operation §
Check bypass valve operation § Inspect fan operation § Remove dirt or debris from fan and air inlet
screens § Clean Strainers Clean float valve assembly and
check for proper operation; § Suitably treat and repaint all corroded
surfaces; § Operate all hand valves and inspect for
correct operation |
Pricing
Item |
Description |
Unit |
Rate(Year 1) Excluding Vat |
Rate(Year
2) |
1. |
Normal
working Hours (Monday to Friday from 7am to 4:00pm) |
|
|
|
|
1.1.
Labour rate (air-con technician) |
hr |
|
|
|
1.2
Labour rate (electrician) Test,
label, repair and commission all electrical connections including to provide
C.O.C. All DB's must be checked.
|
hr |
|
|
|
1.3 Labour rate (assistant artisan) |
hr |
|
|
2. |
After
hours |
|
|
|
|
2.1.Labour Rate (Air-con Technician) |
hr |
|
|
|
2.2 Labour rate (electrician) Test,
label, repair and commission all electrical connections including to provide
C.O.C. All DB's must be checked
|
hr |
|
|
|
2.2 Labour rate (assistant artisan) |
hr |
|
|
3. |
Sunday
Hours |
|
|
|
|
3.1.Labour Rate (Air-con Technician) |
hr |
|
|
|
3.2 Labour rate (electrician) Test,
label, repair and commission all electrical connections including to provide
C.O.C. All DB's must be checked
|
hr |
|
|
|
3.3 Labour rate (assistant artisan) |
hr |
|
|
4. |
Public
Holidays |
|
|
|
|
4.1.Labour Rate (Air-con Technician) |
hr |
|
|
|
4.2 Labour rate (electrician) Test,
label, repair and commission all electrical connections including to provide
C.O.C. All DB's must be checked.
|
hr |
|
|
|
4.3 Labour rate (assistant artisan) |
hr |
|
|
5. |
Travel
Rate to be calculated from central office, Mokopane |
km |
|
|
|
0-50 |
km |
No Charge |
No Charge |
|
>50
up to 500 maximum |
km |
|
|
6. |
Material
Mark-up |
% |
|
|
7. |
Service
of split type air conditioner |
Ea |
|
|
8. |
Service
of window/wall type air conditioner |
Ea |
|
|
9. |
Service
of console type air conditioner |
Ea |
|
|
|
|
|
|
|
|
Sub - total |
|
|
|
|
VAT |
|
|
|
|
Grand
total |
|
|
|
No |
EVALUATION CRITERIA |
TOTAL POINTS
|
POINTS SCORED |
MINIMUM REQUIRED |
1. |
Previous Experience: (Relevant experience
to Air conditioning repairs, maintenance and service) (Supply
detail info on projects successfully completed and letters of references) · >3 Recent Projects= 20
points · 2- 3 Recent Projects =17 points · 1- 2projects
= 10 points |
20 |
|
17 |
2. |
CIDB Grading · 2 ME or higher = 15 Points · 1 ME = 13 Points · No CIDB = 0 Points |
15 |
|
13 |
3. |
Capacity: Resources available for this
project (min 4, attach copies of trade test certificates, National Diploma
and CVs) · Trade tested air con technicians
x 2 ,1 x Senior technician with S4/National Diploma Electrical/Mechanical
Engineering, and 1 trade tested electrician with wiremans license = 15
points · Trade tested air con technicians
x 2, with no electrician = 10 Points · Trade tested air con technician
x 1, with or without electrician = 0 points |
15 |
|
10 |
|
TOTAL |
50 |
|
40 |
|
Minimum of 80% must be achieved to qualify
to next evaluation stage (Price 80 and 20 BEE). Formula will be used to
determine successful bidder |
|
|
|
Bidders are hereby invited to submit quotations by Friday 13 November 2020 at 10h00am. Due to COVID- 19 only emailed submissions will be accepted. Please email your quotation to Mr M Jwara, pmi@waterbergcollege.co.za. Please attach BBBEE certificate, CSD report, Tax Clearance, Bank verification letter, CIDB grading status, company proposal detailing project team and their qualifications etc., price proposal, trade test certificates and personnel CVs
All
queries can be addressed to Waterberg College Infrastructure Manager, Mr MT
Jwara on 015 492 9000